Things are going to ramp up

Beginning October 26, work will begin on the new ramp and roof over it. First the current ramp will have to be dismantled. Then the construction will begin.

Ramp 466

The new ramp will be longer than the current ramp. The new ramp will meet the latest building code accessibility requirements. The roof will be a protective covering from falling snow in winter. It will cover both the ramp area and the south door.

Donations are welcome towards the cost of this work. $100 = 1 inch. Donations are tax receiptable.

NOTICE! Until the work is completed, please enter the church by the 10th Street Entrance instead of the ramp door and south entrance from the parking lot. If you require use of the elevator during the week, please phone before you come, so that someone can meet you at that entrance.  On Sunday mornings, a volunteer will be stationed at that entrance to operate the elevator for you. On Sunday mornings, the usual doors will be open except the ones noted above.

 

Comments are closed, but trackbacks and pingbacks are open.